Every product changes after release. A supplier drops a part, a field return exposes a weak spot, a customer asks for a variant. The change itself is often small. What causes trouble is everything around it: a drawing nobody updated, stock built to the old revision, a supplier still cutting parts from last month’s file. A change process exists to catch those, and a PDM vault is where it can run with the least friction.
From change request to released revision

A typical change process in a PDM vault has five stages:
- ECR: change request: anyone can raise a problem or idea. Capture the reason, not just the fix.
- Review: impact, cost, interchangeability and approval. This is where most of the thinking happens.
- ECO: change order: approved scope and affected files. The order lists exactly what will change.
- Implement: files checked out, edited, then checked in. Work happens on the files named in the order, not on whatever looked related.
- Release: new revision; notice to production and suppliers.
The request and the order are different documents for a reason. Many requests are rejected or merged, and keeping them separate stops half-approved ideas from leaking into released files. In SolidWorks PDM, the stages can be modeled as a workflow with states, transitions and approvals, so a file cannot reach a released state without the review it needs. For how released files are protected, see How SolidWorks PDM Workflows Keep Unreleased Files Off the Shop Floor.
Change impact checklist

Questions to answer before an ECO is approved:
- Where used: which assemblies, drawings and products include this file?
- Interchangeable? New revision or new part number (form, fit and function). The rule is covered in Smart vs Non-Significant Part Numbers.
- Stock, work in progress and parts on order: use, rework or scrap?
- Drawings, BOMs and documents that must change with it.
- Suppliers and tooling that need the new data.
- Compliance: does the change touch the risk assessment or test reports? For CE-marked products, the technical file has to follow the design.
- Effectivity: from which date or serial number?
- Tolerances: do fits and stack-ups still close?
One part change, many files

The where-used view of a single bracket revision (example) shows why question 1 comes first. Bracket rev B → C touches the bracket drawing, subassembly A, subassembly B and a service kit, and both subassemblies roll up into the product: main assembly. BOMs, manuals and the technical file may follow. Every box is a file someone must check before release. PDM answers the where-used question from the vault references in seconds, which is far more reliable than memory or a search of a shared drive.
Release is also when the revision changes, not at every save. Check-ins create versions; the released revision is a deliberate step. See Version vs Revision in SolidWorks PDM and Revision Schemes Explained.
Questions to ask before you start
- Is every released change traceable to a request and an approval?
- Does the review check where-used, interchangeability, stock and suppliers every time?
- Who tells production and suppliers that a new revision is released?
How Sollows can help
Sollows Technical sets up SolidWorks PDM workflows, data cards and change processes sized for small teams, and carries out design changes with the drawings, BOMs and documents kept in step. Where a change affects fits, we run detailed tolerance stack-ups using worst-case, statistical (RSS) and vector loop analysis before it is released.